Find China and global products, suppliers and manufacturers.
Gold
3rd year
Home > Selling Leads > 2 Used ABB 273MW Combined Cycle Power Plant

 

Shenzhen Teweite Mechanical & Electrical Equipments Co., Ltd.

City : Shenzhen

Province/State : Guangdong

Country/Region : China

Telephone: 86-0755-89901385

 

View Contact Details

2 Used ABB 273MW Combined Cycle Power Plant

Detailed Product Description

Model
ABB
Manufacture Year
1994
Running Hours
20000h
Power
273MW
Origin
Switzerland
speed
Remark
Main equipments and auxiliaries are in good condition
This 273MW combined cycle power plant is completely introduced from ABB Group Switzerland. Company and manufactured by America GE Company. It was commercially run in 1993 year. It is composed of two (2) GT13D3A gas turbines and one (1) DK1-1N31 steam turbine.
 
The operating conditions and main technical data are as follows:

1. Operating conditions:
Atmospheric Temperature:             25a??
Atmospheric Pressure:                1010mbar
Humidity:                            80%
Fuel:                                180cst HFO
2. Gas turbine data:
Model:                                 GT13D3A
Compression Grade:                        18
Turbine Grade:                             5
Pressure Ratio:                             12.4
Air Flow:                                 317kg/s
Turbine Inlet Temperature:                    990a??
Turbine Exhaust Temperature:                 500a??
Combustor:                             Single-cylinder, Single injector                
3. Operating data (Standard Status and Basic Load)
Output power of each turbine:                           92MW
Total output power by combined cycle:                    273MW
Unicycle Fuel consumption:                            296g/kWh
Unicycle Heat efficiency:                              29.8%
Combined cycle Fuel consumption:                      204g/kWh
Combined cycle Heat efficiency:                         43%
Combined cycle Total Heat consumption:                   8376KJ/kWh
4. Steam turbine main data:
Model:   DK1—1N31 Single-cylinder, Straight condensing, Reaction turbine
Grade Number:                              26
Inlet Steam Pressure:                        36bar
Inlet Steam Temperature:                     473a??
Exhaust Steam Pressure:                     0.065bar
Rated Power:                                87MW
5. The Overhaul of generating set:
Under the terms of manufacturer- ALSTOM, when use HFO fuel, the overhaul cycle of GT13D3A gas turbine is 16000EOH, GT13DM gas turbine: 24000EOH, steam turbine: 50000EOH.
 
No.1 gas turbine overhaul
Times
Date
Starts
OH
EOH
Active power (MWh)
Main renewal components
1
1997.12.11
403
11990
18737
877421
TULA1 and TULE1 are all branded new
2
2001.01.01
585
27861
39562
2094414
TULA1 and TULE1 are renew;
TULA2???3 and TULE2???3 are branded new.
3
2004.02.20
769
45525
55958
3411629
TULA1???4???5 and TULE1???4???5???all renew??????
21pcs of vane of TULE2???all renew??????
VELA1???2???3???all renew???.

According to the operating decision of our power plant, we don’t make the four times overhaul and update to the No.1 gas turbine.
** TULA: means Turbine rotor blade, TULE: means Turbine stator blade; VELA: means compressor rotor blade; VELE: means compressor stator blade.

No.2 gas turbine overhaul
Times
Date
Starts
OH
EOH
Active power (MWh)
Main renewal components
1
1998.01.25
360
12216
18076
906582
TULA1 and TULE1 are all branded new
2
2001.03.01
527
27942
38482
2101047
TULA1 and TULE1 are renew;
TULA2???3 and TULE2???3 are branded new.
3
2003.12.28
684
45176
53623
3374592
TULA1???4???5 and TULE1???4???5???all renew??????
25pcs of vane of TULE2???all renew??????
VELA1???2???3???all renew???.
4
2006.11.07
848
60573
71652
4520472
TULA1???2???3???4???5 including complete of blade carrier, complete of turbine out casing, combustor tile hanging; VELA1—6, VELE1--- 4, these are all branded new

No.2 gas turbine after updating, the increased guaranty load is 6MW, the increased guaranty relative efficiency is2.5%. The overhaul cycle extend to 2400EOH. The actual results are higher than above guaranty data.

Steam turbine overhaul
Times
Date
Starts
OH
Active power (MWh)
Main renewal components
1
2002.02.09
224
47737
2389413
Four Throttle valve plugs.

6. Combined cycle generating set statues at present:
This CCP was commercially run in 1994. Until 31th August of 2008, main operating data of the two gas turbines and one steam turbine are as follows:
 
Starts
OH
EOH
Active power (MWh)
EOH since last time of overhaul
No.1 gas turbine
1012
67550
82701
4995475
26743
No.2 gas turbine
933
69220
81999
5220679
10347
Steam turbine
412
98269
 
5215761
50532

No.1 gas turbine has run 26743EOH since the third time overhaul in February of 2004 to 31th August of 2008, it was working 10743EOH over overhaul cycle. Through strengthening A check and extraordinary inspection to find and process the trouble and flaw; To be safe we low the turbine inlet temperature from 990a?? to 980a??, at the same time minimize the running time. It is only used during the NO.2 gas turbine cleaning after one overhaul cycle. So far, each system and component is in normal condition and statues.

No.2 gas turbine after the fourth overhaul and updating in beginning of 2007, each component is in good and perfect conditions except a little corrosion in TULE1.After updating, NO.2 gas turbine increase its output power and low its fuel consumption.
The steam turbine is in good and perfect conditions, the last stage blade haven’t found any water erosion so far.
Post Date:10/9/2009
Expiry Date:2/6/2010

Cannot find what you're looking for? Post a buying lead.

Send Message