Shanxi Zhongtu Traffic Technology Co., Ltd.
China Manufacturer with main products: Roadmark, Roadmark Paints, Pavement Markings, Solvent-Based Paint Mark, Waterborne Paint Marking, Mma Skip Stripe, Thermoplastic Paint, Mma... |
MMA Two-Component High-Light Pavement Marking Material (MMA Cold Plastic)
FOB Price: | 2923.00 - 3846.00 USD/Ton |
---|---|
Supply Ability: | 800 Ton(s) per Month |
Shipping: | prompt |
Payment Terms: | L/C, T/T |
Export Markets: | North America, South America, Eastern Europe, Southeast Asia, Africa, Oceania, Mid East, Eastern Asia, Western Europe |
---|---|
Place of Origin: | Shanxi in China |
Packaging Details: | 25kg/drum |
Quick Details
- Brand Name: Shanxi Changda
- State: Liquid Coating
- Application Method: Spray Application and Screeding Application
- Usage: Building Coating,Road Marking Paint
- Main Raw Material: Methyl methacrylate
- Model Number: II
- EINECS No.: ---
- MF: ---
- Other Names: Cold plastic road marking paint
- CAS No.: ---
- Retroreflective valve: >/=350 mcd(white)
- Curing time: =15minutes
- Density (g/cm3): 2
- Abrasion resistance: =35mg
- Color: White/Yellow /Customize other colors
Specifications
Advantage:
* Material from Evonik Industries;
* Excellent brightness and night visibility;
* Anti-crack & strong tenacity;
* Wear resistance is 2 times better than thermoplastic marking;
* Excellent aging resistance;
* Environment protection,100% solid content and no volatile substances.
Construction mode includes spraying application and screed application and extruded application.
Contrast about the adhesive strength between glass beads and paint
Consumption (Actual consumption depends on the thickness of marking & Roughness of pavement & Local temperature environment )
Surface temperature 25 |
Spraying application (0.5mm-0.7mm) |
Screeding application (1.2mm-1.5mm) |
Thickness |
0.6mm |
1.2mm |
paint |
1kg/ |
3kg/ |
Hardner |
15g/ |
45g/ |
Primer |
150g/ |
|
Glass beads |
0.5kg/ |
0.5kg/ |
Dosage table of curing agent (Used in B component)
Paint |
Hardner |
Surface temperature() |
Ratio of BPO |
Surface dry time (Min) |
Curing time (Min) |
B component |
White color Powder |
5 |
750g-800g |
25 |
50 |
15 |
700g-750g |
20 |
35 | ||
25 |
650g-700g |
10 |
20 | ||
35 |
550g-600g |
8 |
15 |
Technical Data:
Retroreflective valve:350 mcd(white)
Curing time:15minutes
Density (g/cm):2
Abrasion resistance:35mg
Color:White/Yellow /Customize other colors
the matters needing to attention during the construction
1. Dry & Clean & flat of road surface.
2. Damaged road should be repaired before applying.
3. Before applying,should add the hardner according to the ratio to the MMA two-component
(Component B) pavement marking paint,then stir well.
4. Avoid breathing vapors,eyes and skin should not touch the coating.
5. during Construction,eating and drinking and smoking is prohibited.
Attention of construction
1. Clean and dry road surface.
2. Construction environment temperature is about 10 to 40, surface temperature generally
Is above 5.
3. the curing time depends on the consumption of curing agent & the temperature of construction
Environment,but has nothing to do with the thickness of the coating.
4. Strictly prohibited from direct sunlight during transport and storage,stored in ventilated
and shade and dry place,the storage temperature should be controlled in 0 to 40.
5. during screeding application,it is recommended that two scraper buckets be equipped for
Continous replace
Road Marking Adhesive from this supplier
More products from other suppliers
Maintenance Road Marking Adhesive Suppliers :
Can't find a suitable Supplier or product? Entrust ECVV to purchase the well-chosen Chinese products with high cost performance.
Learn More>> Start Safebuy Order